Robertson County · 28.3 miles from Brentwood
Older homes and steep edges in Ridgetop
Ridgetop’s houses are mostly settled, its trees are big, and its gentle ground ends abruptly where steep Bodine slopes begin.
TL;DR
Ridgetop, in Robertson County, is about 28 miles from Brentwood. Of its 846 homes, 45 percent were built before 1980, so old drain lines, mature trees and stumps are common work. Mountview silt covers 41 percent of the sample points near its center at an 8 percent median slope, but Bodine, at 19 percent, drops away at 35 percent, which is where retaining walls and benches come in.
What do older Ridgetop homes need from an excavator?
New drain lines, mostly, and room to work around big roots. Ridgetop has 1,995 people and 846 homes; 45 percent of them were built before 1980, 13 percent in the 2000s and 13 percent in 2010 or later, with a median build year of 1983. On a lot that old, the gutter drains, sewer lateral and water service may all be original.
Pipe that has been in the ground for decades cracks, sags or fills with roots. We locate it, dig to the problem and replace the run with trenching held on grade by a pipe laser. Tennessee 811 marks the public lines first, and GPS locators help with the private ones nobody mapped. Where water has been pooling against the foundation, a French drain often goes in on the same visit.
Can you remove a big tree and its stump in Ridgetop?
Yes, and on older lots there are usually several. Trees planted when these houses were new have had forty or fifty years to grow, often right over the drain lines and against the foundation. Taking one down is part of land clearing: the tree in sections, the brush hauled off, the stump dealt with last.
What happens to the stump depends on the plan. Under a lawn, grinding is quick and the roots rot slowly in place. Where a patio, a driveway or a new drain is going in, the whole root ball comes out with the excavator so nothing settles later. Burning the brush instead needs a free state permit from BurnSafeTN.org between October 15 and May 15.
What happens where Ridgetop’s flat ground falls away?
The slope changes fast, and the soil with it. Mountview, at 41 percent of the sample points, is very deep silt over limestone residuum with a median slope of 8 percent, which is easy ground for a yard or a pad. Bodine, at 19 percent, has a median slope of 35 percent here and is described as very deep, somewhat excessively drained gravelly soil on sharply dissected uplands.
Fill pushed off the Mountview edge onto Bodine won’t stay without help. A retaining wall holds it, built on a compacted base with drainage and stone backfill behind the block or stone. Benches work where there’s room. Dickson soil, at 13 percent, has a fragipan that keeps water near the surface, so a wet patch on the flat ground may need a drain rather than a regrade.
How does a Ridgetop job get started?
With a picture. Ridgetop is about 28 miles from Brentwood in a straight line, near the outer edge of our 30 miles, so clear photos of the tree, the wet spot or the slope help us plan the trip. The estimate is free, and what will be disturbed is agreed before the work is booked.
At an acre or more of disturbance, the state’s TNR100000 construction stormwater permit applies. Mention whether the house drains to a public sewer or a septic system, since that changes where a new line can run.
The work, wherever the job is
Closest to Ridgetop
- Greenbrier, TN1.7 mi
- Millersville, TN3.2 mi
- Goodlettsville, TN6 mi
- Shackle Island, TN8.6 mi
- Whites Creek, TN9.3 mi
- Joelton, TN9.6 mi
Answers
Ridgetop questions
Do older Ridgetop homes have bad drain lines?
Many do. With 45 percent of Ridgetop’s homes built before 1980, original drain and sewer lines are often cracked or full of roots. We dig to the failure, show you what broke and replace the run, with Tennessee 811 called first.
Should I grind or pull a stump in my Ridgetop yard?
Grind it if lawn is going back over the spot. Pull the whole root ball if a patio, driveway, wall or drain line is planned there, because roots left under new work rot and leave a soft spot. We do either one.
Can you level a Ridgetop yard that drops off at the back?
Yes, up to the edge. Mountview ground on top grades out easily, but where it breaks onto Bodine slopes near 35 percent, fill needs a retaining wall or benching to hold. The wall goes on a compacted base with drainage and stone backfill behind it.
Is Ridgetop within your service area?
Yes. Ridgetop is about 28 miles from Brentwood in a straight line, inside the 30 miles we cover. Send a picture and a few words about the job, and we’ll come back with a free estimate and what the work would disturb.